http://crr-architecture.com/wp-content/uploads/2014/03/23B6598-2.jpg
http://crr-architecture.com/wp-content/uploads/2014/03/Montbeliard_Page_1_Image_0002.jpg

Lou Blazer Secondary School

Contracting party: Doubs General Council

Deconstruction and reconstruction of the secondary school:

  • 550 students in general education
  • 64 students in a Specialised Teaching Department
  • Construction of day-school buildings, canteens, multi-purpose rooms and accommodation.

8,775 M2 / COST OF WORKS: € 13 M / DELIVERY: 2013 

Environmental Approach:

  • Bioclimatic low-energy building
  • Production of electricity and solar DHW
  • Rainwater harvesting
  • Water absorbed into the plot
  • On-site recycling of demolition materials
  • Use of local timber frame industries
http://crr-architecture.com/wp-content/uploads/2014/03/Montbeliard_Page_2_Image_00012.jpg
http://crr-architecture.com/wp-content/uploads/2014/03/Montbeliard_Page_2_Image_0003.jpg http://crr-architecture.com/wp-content/uploads/2014/03/Montbeliard_Page_2_Image_0004.jpg
http://crr-architecture.com/wp-content/uploads/2014/03/Montbeliard_Page_2_Image_0002.jpg http://crr-architecture.com/wp-content/uploads/2014/03/Montbeliard_Page_1_Image_0010.jpg
http://crr-architecture.com/wp-content/uploads/2014/03/23B6765-R-modif.jpg