http://crr-architecture.com/wp-content/uploads/2014/01/37Dojo-9753.jpg
http://crr-architecture.com/wp-content/uploads/2014/01/71Dojo-a-Tergnier-2012.jpg
http://crr-architecture.com/wp-content/uploads/2014/01/67Dojo-a-Tergnier-2012-isabel-Tabellion-9873.jpg http://crr-architecture.com/wp-content/uploads/2014/01/75Dojo-a-Tergnier-2012-isabel-Tabellion-9896.jpg http://crr-architecture.com/wp-content/uploads/2014/01/36Dojo-a-Tergnier-2012-isabel-Tabellion-9750.jpg
http://crr-architecture.com/wp-content/uploads/2014/01/25Dojo-9792.jpg

Cathy Fleury Dojo

Contracting party: Tergnier Municipality
Capacity for 1,650 spectators (martial arts and wrestling)

  • Capacity for 400 spectators
  • 4 sparring areas
  • 1 warm-up area
  • 1 weights room
  • Offices
  • Changing rooms

2,533 M2 / COST OF WORKS: € 4.1 M / DELIVERY: 2012

Environmental Approach:

  • “Low-Energy Building”
  • double flow CMV
  • Extensive use of PEFC standard wood (130m2)
  • Water retention with watering of green areas
  • Abundant natural lighting thanks to north-light roofs, allowing an average daylight quotient of 3% to be reached
http://crr-architecture.com/wp-content/uploads/2014/01/IMG_1074.jpg
http://crr-architecture.com/wp-content/uploads/2014/01/46Dojo-a-Tergnier-9819.jpg http://crr-architecture.com/wp-content/uploads/2014/01/97Dojo-0092.jpg http://crr-architecture.com/wp-content/uploads/2014/01/photo21.jpg